New construction projects in Egg

District Uster · 1 project

Egg is a municipality in the district of Uster in the Canton of Zurich, with 8'726 inhabitants. New builds in Egg, as of 11.09.2026: one active new-build project with 5 apartments. All projects come from the official building and dwelling register, including those not yet listed on any portal.

Current residential and construction projects in Egg

RentUnder construction
Unlock address

Ersatzneubau der Siedlung Pünt in Egg ZH – die erste Holzbausiedlung der Eigengrund. Auf dem Areal der heutigen sanierungsbedürftigen Siedlung entstehen sieben Ersatzneubauten mit 89 Wohnungen für alle Bedürfnisse. Ein Wohnhaus ist dem Alterswohnen zugedacht. Die neue Siedlung entspricht dem Standard Nachhaltiges Bauen Schweiz und bietet attraktiven Aussenraum mit Grünflächen. Der Wohnungsmix umfasst 17 Zweizimmer-, 20 Zweieinhalb-, 27 Dreieinhalb-, 14 Viereinhalb- und 11 Fünfeinhalb-Zimmer-Maisonettewohnungen. Gemeinschaftliche Angebote wie Gemeinschaftsraum, Gästezimmer, Jugendraum und Bastelraum bereichern das Zusammenleben. Bezug voraussichtlich Q4 2026 und Q2 2027.

Find your new-build home in Egg

With the address, project website and surroundings details for the current project.

Sign up for free

No credit card required

Key figures for Egg

Population

8'726

Egg has 8'726 inhabitants — ranked 39 of 160 in the canton.

The population figure shows the resident population of the municipality.

Population growth

−1.1%

Over the last five years the population has declined by 1.1%.

Growth shows the change in resident population over the last five years.

Tax rate 2026

101%

At 101%, Egg ranks 47 of 160 in the canton, a comparatively low tax burden.

The tax rate (Steuerfuss) shows how high municipal taxes are relative to the basic cantonal tax: lower means a lighter burden.

Vacancy rate 2025

0.73%

In Egg it stands at 0.73%, a moderately strained market.

The vacancy rate measures the share of empty dwellings: a low value points to a high-demand market.

Source: Statistisches Amt Kanton Zürich

Frequently asked questions about new construction in Egg

How many new construction projects are there in Egg in 2026?

There is currently one active new construction project recorded in Egg (as of 11.09.2026).

Which new builds in Egg are planned, approved or under construction?

Current status in Egg: 1 under construction.

Are there new-build apartments for first occupancy in Egg?

New-build apartments in Egg come from the projects listed above. First-occupancy listings usually appear only shortly before completion. Baulens shows each project with its construction status from the building register and links directly to the project website, where rentals or sales are announced.

Are there new-build apartments for sale in Egg?

Egg currently has no new-build projects for sale and one for rent (as of 11.09.2026). Each project links directly to its project website.

How high is the tax rate in Egg?

The municipal tax rate (Steuerfuss) of Egg is 101% of the simple cantonal tax in 2026. Source: Statistical Office of the Canton of Zurich.

What is the vacancy rate in Egg?

In Egg the vacancy rate was 0.73% in 2025. It shows the share of apartments standing empty: a low value points to a market with strong demand.

Where can I see the address and project website of the new-build projects in Egg?

You can see the address, project website and surroundings of every project in Egg on the Baulens map. 3 projects are free, no credit card required.

All new construction projects in Canton Zurich on one map

Map, filters, statistics and details for every recorded new construction project in Canton Zurich.

Sign up for free

No credit card required

Interactive map of all new residential construction projects in Canton Zurich with developer, address, and status