New construction projects in Dürnten

Hinwil district · 1 project

Dürnten is a municipality in the district of Hinwil in the Canton of Zurich, with 8'021 inhabitants. New builds in Dürnten, as of 18.10.2026: one active new-build project with at least 6 apartments. All construction projects come from the official building and dwelling register, including those not yet listed on any portal.

BuyUnder construction
Unlock address

Moderne Wohnüberbauung mit 6 hochwertigen Eigentumswohnungen an attraktiver Lage in Tann ZH. Das Projekt verbindet zeitgemässe Architektur, durchdachte Grundrisse und hochwertigen Ausbaustandard. Jede Wohnung bietet individuelle Gestaltungsmöglichkeiten bei Küche, Sanitärausstattung und Belägen. Die Gebäudetechnik umfasst Fussbodenheizung, Erdwärme, Photovoltaikanlage und elektrische Lamellenstoren. Waschmaschine und Tumbler befinden sich in jeder Wohnung. Der Standort bietet ruhige, naturnahe Lage mit guter Infrastruktur, Nähe zu Grün- und Erholungsflächen sowie guter Anbindung an öffentliche Verkehrsmittel. Fertigstellung geplant für 1. Juni 2027.

Find your new-build home in Dürnten

With the address, project website and surroundings details for the current project.

Sign up for free

No credit card required

Key figures for Dürnten

Population

8'021

Dürnten has 8'021 inhabitants — ranked 43 of 160 in the canton.

The population figure shows the resident population of the municipality.

Population growth

+4.9%

Over the last five years the population has grown markedly by 4.9%.

Growth shows the change in resident population over the last five years.

Tax rate 2026

113%

At 113%, Dürnten ranks 105 of 160 in the canton, around the cantonal average.

The tax rate (Steuerfuss) shows how high municipal taxes are relative to the basic cantonal tax: lower means a lighter burden.

Vacancy rate 2025

1.75%

In Dürnten it stands at 1.75%, a comparatively relaxed supply.

The vacancy rate measures the share of empty dwellings: a low value points to a high-demand market.

Source: Statistisches Amt Kanton Zürich

Frequently asked questions about new construction in Dürnten

There is currently one active new construction project recorded in Dürnten (as of 18.10.2026).

Current status in Dürnten: 1 under construction.

New-build apartments in Dürnten come from the projects listed above. First-occupancy listings usually appear only shortly before completion. Baulens shows each project with its construction status from the building register and links directly to the project website, where rentals or sales are announced.

Dürnten currently has one new-build project for sale and none for rent (as of 18.10.2026). Each project links directly to its project website.

The municipal tax rate (Steuerfuss) of Dürnten is 113% of the simple cantonal tax in 2026. Source: Statistical Office of the Canton of Zurich.

In Dürnten the vacancy rate was 1.75% in 2025. It shows the share of apartments standing empty: a low value points to a market with strong demand.

You can see the address, project website and surroundings of every project in Dürnten on the Baulens map. 3 projects are free, no credit card required.

All new construction projects in Canton Zurich on one map

Map, filters, statistics and details for every recorded new construction project in Canton Zurich.

Sign up for free

No credit card required

Interactive map of all new residential construction projects in Canton Zurich with developer, address, and status