New construction projects in Langnau a.A.
Horgen district · 1 project
Part of the region: New Construction Projects at Lake Zurich
Langnau a.A. is a municipality in the district of Horgen in the Canton of Zurich, with 8'085 inhabitants. New builds in Langnau a.A., as of 27.10.2026: one active new-build project with at least 6 apartments. All construction projects come from the official building and dwelling register, including those not yet listed on any portal.
Elements Langnau ist ein Neubauprojekt mit exklusiven Maisonette- und Geschosswohnungen. Das Projekt bietet vielfältige Wohnlösungen von 2.5 bis 4.5 Zimmern, ausgestattet mit modernem Komfort, privaten Gartenflächen, Terrassen und hochwertiger Ausstattung. Alle Einheiten sind barrierefrei mit Lift erschlossen. Die Maisonetten zeichnen sich durch grosszügige Raumaufteilung, mehrere Bäder und direkte Kelleranschlüsse aus. Das Projekt kombiniert Natur und zeitgemässes Wohnen mit hochwertiger Architektur.
Find your new-build home in Langnau a.A.
With the address, project website and surroundings details for the current project.
Sign up for freeNo credit card required
Key figures for Langnau a.A.
Population
8'085
Langnau a.A. has 8'085 inhabitants — ranked 42 of 160 in the canton.
The population figure shows the resident population of the municipality.
Population growth
+2.6%
Over the last five years the population has grown slightly by 2.6%.
Growth shows the change in resident population over the last five years.
Tax rate 2026
106%
At 106%, Langnau a.A. ranks 63 of 160 in the canton, around the cantonal average.
The tax rate (Steuerfuss) shows how high municipal taxes are relative to the basic cantonal tax: lower means a lighter burden.
Vacancy rate 2025
0.59%
In Langnau a.A. it stands at 0.59%, a moderately strained market.
The vacancy rate measures the share of empty dwellings: a low value points to a high-demand market.
Source: Statistisches Amt Kanton Zürich
Frequently asked questions about new construction in Langnau a.A.
There is currently one active new construction project recorded in Langnau a.A. (as of 27.10.2026).
Current status in Langnau a.A.: 1 approved.
New-build apartments in Langnau a.A. come from the projects listed above. First-occupancy listings usually appear only shortly before completion. Baulens shows each project with its construction status from the building register and links directly to the project website, where rentals or sales are announced.
Langnau a.A. currently has one new-build project for sale and none for rent (as of 27.10.2026). Each project links directly to its project website.
The municipal tax rate (Steuerfuss) of Langnau a.A. is 106% of the simple cantonal tax in 2026. Source: Statistical Office of the Canton of Zurich.
In Langnau a.A. the vacancy rate was 0.59% in 2025. It shows the share of apartments standing empty: a low value points to a market with strong demand.
You can see the address, project website and surroundings of every project in Langnau a.A. on the Baulens map. 3 projects are free, no credit card required.
Construction projects in other municipalities
All municipalities in Canton ZurichAll new construction projects in Canton Zurich on one map
Map, filters, statistics and details for every recorded new construction project in Canton Zurich.
Sign up for freeNo credit card required
